Semen Klenov

Home / Journal / 3D & CGI

Project Organization: a practical CGI guide

Use the same folder structure for every project, from 00_admin to 09_archive.

CGIBy Semen Klenov26 November 2026

Project Organization: a practical CGI guide

A finished shot depends on finding the right file at the right moment. Lost textures, “final_v3_REAL.blend” and a missing cache are the most common reasons a deadline fails. Organization is not bureaucracy: it is the cheapest insurance in production.

Key points

  • Use the same folder structure for every project, from 00_admin to 09_archive.
  • Name with versions (v001, v002), never with “final”.
  • Follow the 3-2-1 backup rule: three copies, two media, one off-site.
  • Keep notes: a short README in each project saves hours later.

Folder Structure

A standard structure is predictable, so anyone can open the project:

2026_ClientName_ProjectName/
├── 00_admin/        brief, contract, invoices, notes
├── 01_ref/          reference, moodboards, own photos
├── 02_assets/       models, textures, HDRIs, fonts
├── 03_scenes/       .blend / .hip files
├── 04_cache/        simulation and geometry caches
├── 05_renders/      EXR sequences by shot and version
├── 06_comp/         compositing projects
├── 07_audio/        music and sound
├── 08_delivery/     final files per platform
└── 09_archive/      closed versions and project backup
  • Numbered folders keep the order stable in every file browser.
  • Relative paths: Reference textures and caches with paths relative to the project, so the folder can move to another machine.
  • Separate source from result: The render and cache folders are large and regenerable; the scene and assets are the valuable part.

Naming and Versions

  • Convention: project_shot_task_v###.ext, for example blkbottle_sh010_light_v012.blend.
  • Rules:
    • No spaces, no special characters, no accents; use _ and lowercase.
    • Version numbers have fixed padding (v001, not v1).
    • Never use “final”, “new” or “latest” in a name; they are not versions.
    • Increment the version on every saved milestone; do not overwrite.
  • Within a scene: Name objects, materials and nodes meaningfully; sort them in collections or groups.
  • Shot codes: sh010, sh020, sh030 leave room to insert shots.
  • Image sequences: name.####.exr with a fixed frame padding.

Backup and Version Control

  • 3-2-1 rule: Three copies of the data, on two different media, one off-site (cloud or another place).
  • Automatic: Time Machine or an equivalent for the working disk; a cloud or NAS for the project; a monthly archive to cold storage.
  • Version control for text files: Git for scripts, notes, HDA definitions and configuration. Git is not good at large binary files.
  • Git LFS: An extension that stores large files (textures, caches, scenes) outside the repository while keeping history.
  • Perforce (Helix Core): Studio standard for large binary projects: file locking, big repositories. Free for small teams.
  • Cloud sync: Dropbox/Drive/iCloud are sync tools, not backups; a deleted file is deleted everywhere.
  • Incremental save: Blender saves the next version with File → Save Incremental; most 3D programs have a similar command or an automatic backup.

Notes and a Knowledge Base

  • Why: Every project teaches something: a shader trick, a render setting, a client’s habit. Without notes you relearn it.
  • Obsidian: A free notes app on plain Markdown files with links between notes. It grows into a personal knowledge base; the same files can later feed an AI assistant as context.
  • What to record: One note per tool/technique, per project post-mortem (what worked, what did not), per client, and a daily log.
  • Link notes to chapters, references and project files. The structure of this book is itself a map for such a vault.
  • Template: A project note with brief, deadline, delivery formats, contacts, decisions, and open questions.

In the tools

  • Blender: File → External Data → Make Paths Relative / Pack Resources; File → Clean Up; use Collections and consistent naming; Save Versions in Preferences.
  • Unreal Engine 5: Move and rename assets only inside the Content Browser, never in Finder or Explorer, so references stay intact; use Revision Control (Git LFS or Perforce) from the editor.
  • DaVinci Resolve: Projects live in a database; export a .drp project file and use File → Media Management to archive the media with the project.
  • System: A short README.md in each project root with the structure, conventions and your contact.

Common mistakes

  • “final_FINAL_v2.blend”.
  • Absolute paths that break on another machine.
  • Caches stored inside the scene file.
  • Backup on the same disk as the project.
  • No notes: the same mistake in the next project.